Industrial Engineering
71. Product layout is employed for
- batch production
- continuous production1
- effective utilization of machine
- all of the above
- none of the above.
Correct answer: (B)
continuous production1
72. Queing theory is associated with
- sales
- inspection time
- waiting time
- production time
- inventory.
Correct answer: (C)
waiting time
73. Queing theory is used for
- inventory problems
- traffic congestion studies
- job-shop scheduling
- all of the above
- none of the above.
Correct answer: (D)
all of the above
74. Queuing theory deals with problems of
- material handling
- reducing the waiting time or idle Jajme
- better utilization of man services
- effective use of machines
- none of the above.
Correct answer: (B)
reducing the waiting time or idle Jajme
75. Replacement studies are made on the fol-lowing basis:
- annual cost method
- rate of return method
- total life average method
- present worth method
- any one of the above.
Correct answer: (E)
any one of the above.
76. Routing is essential in the following type of industry
- assembly industry
- process industry
- job order industry
- mass production industry
- steel industry.
Correct answer: (A)
assembly industry
77. Routing prescribes the
- flow of material in the plant
- proper utilization of man power
- proper utilization of machines
- inspection of final product
- none of the above.
Correct answer: (A)
flow of material in the plant
78. Scheduling gives information about
- when work should start and how much work should be completed during a certain period
- when work should complete
- that how idle time can be minimised
- prcper utilisation of machines
- none of the above.
Correct answer: (A)
when work should start and how much work should be completed during a certain period
79. Slack represents the difference between the
- latest allowable time and the normal expected time
- latest allowable time and the earliest expected time
- proposed allowable time and the ear-liest expected time
- normal allowable time and the latest expected time
- project initiation tune and actual starting time.
Correct answer: (B)
latest allowable time and the earliest expected time
80. Standard time as compared to normal time is
- greater
- smaller
- equal
- there is no such correlation
- none of the above.
Correct answer: (A)
greater