Industrial Engineering

101. The process layout is best suited where

  1. specialisation exists
  2. machines are arranged according to sequence of operation
  3. few number of nonstandardised units are to be produced
  4. mass production is envisaged
  5. bought out items are more.

Correct answer: (C)
few number of nonstandardised units are to be produced

102. The reasons which are basically responsible for the formation of a queue should be that

  1. the average service rate HHess than the average arrival rate
  2. output rate is linearly proportional to input
  3. output rate is constant and the input varies in a random manner
  4. all of the above
  5. none of the above.

Correct answer: (D)
all of the above

103. The salient feature of functional organisation is

  1. strict adherence to specification
  2. separation of planning and design part
  3. each individual maintains functional efficiency
  4. work is properly planned and distributed
  5. all of the above.

Correct answer: (E)
all of the above.

104. The simplex method is the basic method for

  1. value analysis
  2. operation research
  3. linear programming
  4. model analysis
  5. none of the above.

Correct answer: (C)
linear programming

105. The standard time for a job is

  1. total work content
  2. basic time + relaxation time
  3. total work content + basic time
  4. total work content + delay contigency allowance
  5. total work content + relaxation time.

Correct answer: (D)
total work content + delay contigency allowance

106. The technique of value analysis can be applied to

  1. complicated items only
  2. simple items only
  3. crash-programme items only
  4. cost consciousness items only
  5. any item.

Correct answer: (E)
any item.

107. The term 'value' in value engineering refers to

  1. total cost of the product
  2. selling price of the product
  3. utility of the product
  4. manufactured cost of the product
  5. depreciation value.

Correct answer: (C)
utility of the product

108. The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as

  1. Dry work Plan
  2. Halsey Premium Plan
  3. Taylor Plan
  4. Bedaux Plan
  5. Rowan Plan.

Correct answer: (E)
Rowan Plan.

109. The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as

  1. Rowan Plan
  2. Bedaux Plan
  3. Taylor Differential Piece rate system
  4. Halsey Premium plan
  5. Day work plan.

Correct answer: (D)
Halsey Premium plan

110. The two-bin system is concerned with

  1. ordering procedure
  2. forecasting sales
  3. production planning
  4. despatching and expediting
  5. none of the above.

Correct answer: (A)
ordering procedure