271. The small sewers are cleaned by
Correct answer: (A)
Flushing
272. The spacing of bars for perforations in coarse screens used for the treatment of sewage, is
Correct answer: (D)
50 mm
273. The spacing of bars of perforations of fine screens used for the treatment of sewage, is
Correct answer: (A)
2 to 3 mm
274. The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be
Correct answer: (D)
> 1.5 m
275. The standard B.O.D. of water is taken for
Correct answer: (D)
5 days
276. The stone ware sewers
Correct answer: (D)
All the above
277. The suitable cross-section of sewers to carry combined flow, is
Correct answer: (B)
Egg shaped
278. The temperature affects the
Correct answer: (D)
All the above
279. The underground sewers are more subjected to
Correct answer: (B)
Compressive force
280. The use of coarse screens for the disposal of sewage, may be dispensed with by
Correct answer: (C)
Both (a) and (b)